Industrial Facility Pavement Upgrade
Client: Large Manufacturing Plant
Challenge: The client’s heavy truck traffic was causing rutting and surface deformation in loading dock areas, leading to operational downtime and safety hazards.
Solution: Asphalt Roadway used a high-strength asphalt mix with superior load-bearing capacity and integrated geogrid reinforcement for added stability. A phased construction plan ensured that plant operations continued without interruption.
Results:
- Load-bearing capacity increased by 35%
- Zero downtime during construction
- Pavement lifespan projected to double from 7 to 14 years
Key Takeaway: Custom asphalt formulations combined with engineering reinforcement can withstand extreme industrial demands without sacrificing operational continuity.